Days
Hours
Minutes
Seconds
Campaign Ended.

What plumbing setup is required for in-ground installation?

Follow the OUTBACK Plumbing Diagram, adjusting pipework for proper alignment. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface. Run conduit for light cables and earthing tabs, which must be connected before backfilling.

More FAQ's

Days
Hours
Mins
Secs