Days
Hours
Minutes
Seconds
Campaign Ended.

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct specifications. This is especially important for sites with challenging soil conditions, such as clay (H1/H2) or highly reactive soils (P/E). A geo-tech report helps guide the engineering requirements for a stable and safe pool installation.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Days
Hours
Mins
Secs