What plumbing setup is required for in-ground installation?

Follow the OUTBACK Plumbing Diagram, adjusting pipework for proper alignment. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface. Run conduit for light cables and earthing tabs, which must be connected before backfilling.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct