NEW!

Explore over 15,000 combinations. Choose your size, colours, options and locations, and watch your pool take shape in 3D.

What kind of site preparation is required for sloped or uneven terrain?

For sloped or uneven terrain, you may need to level the site by excavating and retaining the area. Alternatively, an engineered steel or concrete base can be used to create a level foundation. Consult an engineer or builder for best results.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct

What should I place my pool on?

We recommend placing the pool on a 100mm SL72 slab. For complex sites, an engineered concrete slab or tank stand may be necessary. Consult your

Days
Hours
Mins
Secs