For sloped or uneven terrain, you may need to level the site by excavating and retaining the area. Alternatively, an engineered steel or concrete base can be used to create a level foundation. Consult an engineer or builder for best results.
What are the requirements for the equipment base?
The equipment base must be level, stable, and positioned no greater than 20m (pipe distance) from the pool for efficient operation. A concrete slab or