Your electrician should supply 240VAC 10A circuits to power the sanitation system and lighting, with up to two GPOs preferred. If you’ve selected a heat pump, a dedicated 240VAC 15A circuit will also be required. Ensure the system is properly earthed. We recommend consulting a certified electrician to ensure compliance with local regulations.
What are the requirements for the equipment base?
The equipment base must be level, stable, and positioned no greater than 20m (pipe distance) from the pool for efficient operation. A concrete slab or