Your electrician should supply 240VAC 10A circuits to power the sanitation system and lighting, with up to two GPOs preferred. If you’ve selected a heat pump, a dedicated 240VAC 15A circuit will also be required. Ensure the system is properly earthed. We recommend consulting a certified electrician to ensure compliance with local regulations.
What are the excavation requirements for an in-ground installation?
Excavate a hole 300mm wider than the pool’s dimensions, and accounting for the depth of the compacted road base or concrete slab. Ensure the ground