Days
Hours
Minutes
Seconds
Campaign Ended.

Do I need to fill the pool upon install?

Yes, the pool must be filled within 24-48 hours after installation to prevent the liner from sagging or deforming, which could affect your warranty. If you need to alter this timeframe, please contact us via email to discuss your situation.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct

Days
Hours
Mins
Secs