Follow the OUTBACK Plumbing Diagram, adjusting pipework for proper alignment. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface. Run conduit for light cables and earthing tabs, which must be connected before backfilling.
What happens if my pool is damaged during delivery or installation?
If your pool is damaged during delivery by Outback or our delivery partners, let us know as soon as possible, and no later than one