Days
Hours
Minutes
Seconds
Campaign Ended.

What is the typical installation time for the pool?

Installation typically takes 1-2 days for a prepared site, depending on site complexity and whether professional help is used for plumbing and electrical connections.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct

Do I need a fence?

All states and territories in Australia interpret the Australian Standard (AS1926.1-2012) differently regarding pool fencing. It is your responsibility to ensure the pool complies with

Days
Hours
Mins
Secs