Installation typically takes 1-2 days for a prepared site, depending on site complexity and whether professional help is used for plumbing and electrical connections.
Do I need a soil/geo-tech report?
Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct