What are the excavation requirements for an in-ground installation?

Excavate a hole 300mm wider than the pool’s dimensions, and accounting for the depth of the compacted road base or concrete slab. Ensure the ground beneath the pool has a minimum bearing capacity of 70 kPa.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct

Do I need council approval?

Yes, council approval and certification are required for any pool in Australia. Documentation differs by state, and it’s your responsibility to complete this process. Applications

Do I need a fence?