NEW!

Explore over 15,000 combinations. Choose your size, colours, options and locations, and watch your pool take shape in 3D.

Should the pool be filled before backfilling?

Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.

More FAQ's

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct

Days
Hours
Mins
Secs