Paint exposed metal areas with a heavy-duty bitumen waterproofing membrane. Ensure proper drainage around the pool by using a slope in the backfill material to direct water away from the shell. Consult the in ground install guide or engneering documentaion for specifics.
Should the pool be filled before backfilling?
Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.