Yes. For mild slopes, excavate and retain a section to create a level area for a concrete slab. For steeper slopes or elevated positions, an engineered steel frame may be required. Consult a structural engineer for the best solution.
Do I need to fill the pool upon install?
Yes, the pool must be filled within 24-48 hours after installation to prevent the liner from sagging or deforming, which could affect your warranty. If