Yes. For mild slopes, excavate and retain a section to create a level area for a concrete slab. For steeper slopes or elevated positions, an engineered steel frame may be required. Consult a structural engineer for the best solution.
Should the pool be filled before backfilling?
Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.