Backfill in 300mm thick layers, compacting each layer to avoid voids. Ensure the backfill creates a 30-degree slope away from the pool shell to direct water away and maintain stability.
Should the pool be filled before backfilling?
Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.