The backfill material is a dry mix of cement-stabilised sand. Dpending on where this is sourced the ratio of sand to cement varies. Consult the in ground install guide or engneering documentaion for specifics.
What are the excavation requirements for an in-ground installation?
Excavate a hole 300mm wider than the pool’s dimensions, and accounting for the depth of the compacted road base or concrete slab. Ensure the ground