If the metal pool shell contacts backfill material, it must be covered with a heavy-duty bitumen waterproofing membrane to prevent corrosion.
Should the pool be filled before backfilling?
Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.