Days
Hours
Minutes
Seconds
Campaign Ended.

How do I manage groundwater for in-ground installation?

Install a 65mm continuous slotted AG pipe connected to a 100mm standpipe to monitor groundwater levels. Ensure groundwater does not exceed 500mm above the pool base. For sloping sites, use slotted AG pipes to redirect water away. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface.

More FAQ's

Do you have permit planners?

Yes, we recomend permit planners in most parts of Australia to help streamline the approval process. These recomendations understand our porduct and have completed a

Do you offer base preparation?

No, we do not offer base preparation. However, we can provide guidance on the requirements for your site. A licensed builder or landscaper can assist

What base is required?

Getting the base right is one of the most important steps before your Outback Plunge Pool arrives. The base supports the full weight of your

Do I need council approval?

Yes, council approval and certification are required for any pool in Australia. Documentation differs by state, and it’s your responsibility to complete this process. Applications

Days
Hours
Mins
Secs