Ensure the pool has sufficient water volume and is connected to firefighting equipment if required. Consult your local fire safety regulations for additional guidance.
Should the pool be filled before backfilling?
Yes, the pool should be completely filled and left for 24 hours to check for leaks before starting the backfilling process.