Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct specifications. This is especially important for sites with challenging soil conditions, such as clay (H1/H2) or highly reactive soils (P/E). A geo-tech report helps guide the engineering requirements for a stable and safe pool installation.
Are there any space requirements for delivery and installation?
Yes, ensure a minimum access width of 1 metre for delivery. For installation, there should be sufficient space around the pool for equipment and pipework