Days
Hours
Minutes
Seconds
Campaign Ended.

Do I need a soil/geo-tech report?

Yes, in most cases, a soil or geo-tech report is required to determine the soil classification and ensure the base is prepared to the correct specifications. This is especially important for sites with challenging soil conditions, such as clay (H1/H2) or highly reactive soils (P/E). A geo-tech report helps guide the engineering requirements for a […]

What are the requirements for the equipment base?

The equipment base must be level, stable, and positioned no greater than 20m (pipe distance) from the pool for efficient operation. A concrete slab or paved area is recommended, with a minimum size of 1200mm x 900mm or 2400mm x 900mm if a heat pump is selected. Ensure the base is elevated slightly to prevent […]

Do I need permits for an in-ground installation?

Yes, 100%. In-ground installations are generally considered construction projects and require a building permit for the pool as well as the safety barrier. All necessary permits and approvals must be obtained before starting the installation. These permits must comply with site-specific documentation, including geo-soil reports, engineering plans, and plumbing diagrams.

What plumbing setup is required for in-ground installation?

Follow the OUTBACK Plumbing Diagram, adjusting pipework for proper alignment. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface. Run conduit for light cables and earthing tabs, which must be connected before backfilling.

What electrical supply do I need to organise?

Your electrician should supply 240VAC 10A circuits to power the sanitation system and lighting, with up to two GPOs preferred. If you’ve selected a heat pump, a dedicated 240VAC 15A circuit will also be required. Ensure the system is properly earthed. We recommend consulting a certified electrician to ensure compliance with local regulations.

What plumbing work needs to be organised?

Each pool comes with pre-plumbed components. You’ll need to connect two pipes between the shell and the equipment. The equipment can be placed up to 20m from the pool. A licensed plumber is recommended for setup.

Days
Hours
Mins
Secs