Days
Hours
Minutes
Seconds
Campaign Ended.

How do I manage groundwater for in-ground installation?

Install a 65mm continuous slotted AG pipe connected to a 100mm standpipe to monitor groundwater levels. Ensure groundwater does not exceed 500mm above the pool base. For sloping sites, use slotted AG pipes to redirect water away. Install a 15mm threaded PVC coupling and pipe to bing the drain plug to the surface.

More FAQ's

Days
Hours
Mins
Secs