What are the excavation requirements for an in-ground installation?

Excavate a hole 300mm wider than the pool’s dimensions, and accounting for the depth of the compacted road base or concrete slab. Ensure the ground beneath the pool has a minimum bearing capacity of 70 kPa.

More FAQ's

Days
Hours
Mins
Secs